PROJECT DETAIL - Mymensingh Power Station (MPS)


Mymensingh Power Station (MPS)
Capacity: 210 MW:
(4X35MW Open Cycle GT & 1X70 MW Steam Turbine)
- Phase - I : 2X35 MW Gas turbine (Commissioned in November 1999)
- Phase –II : 2X35 MW Gas turbine(Commissioned in December 2000)
- Phase –III: 1X70 MW Steam Turbine (Commissioned in July 2007)
-
Project Cost
of
Mymensingh Power Station (MPS)
Total Project Cost for 3 Phases: BDT 15,078,738,882.00
- Phase-I: BDT 2,359,150,203
- Phase-II:BDT 1,673,588,679
- Phase-III:BDT 11,046,000,000
b) Financing:
i) Equity: BDT 667,939,035
Equity raised from REB and Five PBSs
ii) Debt: BDT 1,691,211,168
Debt raised from ADB long term loan of $36.386 million.
Phase-II :
Phase-III :a)Total Project Cost : BDT 1,673,588,679
b) Financing :
i) Equity: BDT 840,708,965
Equity raised from Eight PBSs
ii) Debt: BDT 520,000,000
Debt raised from REB
iii) RPCL own source: BDT 312,879,714
a) Total Project Cost : BDT 11,046,000,000
b) Cost incurred so far : BDT 9,197,523,020
c) Financing:
i) Equity : BDT 909,465,000
Equity raised from 9 PBSs
ii) Debt : BDT 3,840,000,000
Debt raised from REB &11 PBSs
iii) RPCL own fund : BDT 6,296,535,000
Major Plant Machinery
(MPS Phase I & II)
Features of Plant Machinery:
- Gas Turbines : Type PG6551B & PG6561B (GE, France)
- Generators : Type T600C(ALSTOM, France).
- Unit Step-Up Transformers : 35/50MVA (Hyundai, Korea).
- Substation & Switchgear : ABB, Sweden.
Special Features:
- Modern & Environment Friendly Technology.
- Enclosed by Acoustic Walls to reduce noise.
- Dry Low NOx (DLN) Combustion System to reduce Nox (Nox below 15 ppm).
- Mark-V & Distributed Control System (DCS).
- Plant design includes multiple layers of backup control levels to ensure high availability.
- Plant Control is state of the art with computerized generation control and a complete monitoring system of all significant data.
Major Plant Machinery
(Phase-III)
Features of Plant Machinery:
- Steam Turbine : Model: NK 90/3.2 (Siemens, Germany).
- Generator : Model: TLRI 100/36 (Siemens, Germany)
Capacity: 77.3 MW
- Unit Step-Up Transformer : 70/100 MVA (Siemens, Germany).
- Substation & Switchgear : Siemens, Germany.
- Boiler (HRSG) : Standard Fasel, Netherland.
- Air Cooled Condenser (ACC) : Air flow Capacity – 82.5 Kg/s, Balcke Dour GmbH, Germany.
- Water Treatment Unit (WTU) : Capacity – 11.5 m3/hr Chirst, Netherland
Special Features:
-
- Modern & Environment Friendly Technology
- Continuous Exhaust Monitoring System (CEMS)
- PCS-7 Control System
- Additional feature of Station Control & Maintenance
- MIS Server (Maintenance Information System)
- CMMS (Computerised Maintenance Management System)
- THOMS ( Thomassen Online Monitoring System) remote monitoring